Module 3: Technical Implementation

Technical Controls Checklist

Worksheet
25 min
+75 XP

Technical Controls Checklist

This comprehensive checklist helps verify implementation of all technical controls required for ISO 27018 compliance.

ENCRYPTION CONTROLS

Data at Rest Encryption

  • All PII encrypted with AES-256 or stronger
  • Database-level encryption enabled (TDE)
  • File system encryption configured
  • Application-level encryption for sensitive fields
  • Cloud storage encryption enabled (S3, Azure Blob, GCS)
  • Backup encryption implemented
  • Key management system (HSM/KMS) in use
  • Automated key rotation (annual minimum)
  • Key access logging enabled
  • Encryption verified through testing

Data in Transit Encryption

  • TLS 1.3 (or minimum 1.2) enforced on all endpoints
  • Strong cipher suites only (AEAD ciphers)
  • Valid certificates from trusted CAs
  • Certificate expiry monitoring
  • Perfect Forward Secrecy enabled
  • HSTS headers configured
  • Internal service-to-service mTLS
  • Database connections encrypted
  • API communication secured
  • VPN for admin access

Key Management

  • Keys stored in HSM or equivalent
  • Separation of duties for key management
  • Key backup and recovery procedures
  • Key rotation automated
  • Key access audited
  • Cryptographic erasure capability
  • Key lifecycle documented
  • Emergency key recovery tested

ACCESS CONTROL

Authentication

  • Multi-factor authentication for PII access
  • Strong password policies enforced
  • Password complexity requirements
  • Account lockout after failed attempts
  • Session timeout configured (30 min max for PII)
  • Re-authentication for sensitive operations
  • SSO integration (if applicable)
  • API key/token management

Authorization

  • Role-based access control implemented
  • Least privilege principle enforced
  • Need-to-know access only
  • Field-level access control
  • Database row-level security
  • API scope-based authorization
  • Separation of duties implemented
  • Emergency "break glass" procedures

Access Monitoring

  • All PII access logged
  • Real-time anomaly detection
  • Failed access attempt monitoring
  • Privileged access monitoring
  • Access log retention (1 year minimum)
  • Regular access reviews (quarterly)
  • Automated alerting for suspicious access
  • Access audit reports generated

DATA DELETION

Deletion Capabilities

  • Soft delete with grace period
  • Hard delete (permanent removal)
  • Cryptographic erasure option
  • Deletion covers all storage locations
  • Replica deletion automated
  • Backup purge procedures
  • Cache clearing implemented
  • Search index deletion

Deletion Verification

  • Deletion verification process
  • Automated verification checks
  • Deletion certificates generated
  • Sub-processor deletion tracked
  • Deletion audit trail complete
  • Customer notification of deletion
  • Backup verification
  • Recovery impossibility confirmed

Retention Enforcement

  • Retention policies defined
  • Automated deletion based on retention
  • Legal hold capability
  • Deletion scheduling system
  • Retention exceptions documented
  • Regular purge jobs running
  • Retention compliance monitoring

SUB-PROCESSOR CONTROLS

Sub-processor Management

  • Public sub-processor registry
  • Customer notification system (30 days)
  • Objection handling process
  • DPAs with all sub-processors
  • Sub-processor security verification
  • Certification tracking
  • Annual audit schedule
  • Continuous monitoring

Data Flow Control

  • Sub-processor data access tracked
  • Data flow documentation current
  • Sub-processor deletion requests automated
  • Deletion verification from sub-processors
  • Sub-processor incident notification
  • Data location tracking
  • Transfer documentation

NETWORK SECURITY

Perimeter Security

  • Firewall configured and maintained
  • Intrusion detection system (IDS)
  • Intrusion prevention system (IPS)
  • DDoS protection enabled
  • Network segmentation implemented
  • DMZ for public-facing services
  • VPN for remote access
  • Network access control (NAC)

Internal Security

  • VLAN segmentation for PII systems
  • Internal firewall rules
  • Micro-segmentation (if applicable)
  • Zero-trust architecture
  • Network monitoring and logging
  • Traffic analysis for anomalies
  • Bandwidth monitoring

APPLICATION SECURITY

Secure Development

  • Security requirements in SDLC
  • Code review for PII handling
  • Static application security testing (SAST)
  • Dynamic application security testing (DAST)
  • Dependency vulnerability scanning
  • Security testing before deployment
  • Secure coding guidelines followed
  • PII handling documented in code

Runtime Protection

  • Web application firewall (WAF)
  • API gateway with security policies
  • Rate limiting implemented
  • Input validation on all inputs
  • Output encoding
  • SQL injection prevention
  • XSS prevention
  • CSRF protection

Security Headers

  • Content-Security-Policy
  • X-Frame-Options
  • X-Content-Type-Options
  • Strict-Transport-Security
  • X-XSS-Protection
  • Referrer-Policy

LOGGING AND MONITORING

Comprehensive Logging

  • All PII access logged
  • Authentication events logged
  • Authorization failures logged
  • System events logged
  • Security events logged
  • Log integrity protected (immutable)
  • Log retention (1 year minimum)
  • Centralized log management

Monitoring and Alerting

  • Real-time security monitoring
  • 24/7 monitoring coverage
  • Automated alerting configured
  • SIEM solution deployed
  • Threat intelligence integration
  • Incident response procedures
  • Security dashboard
  • Regular log review

Audit Trail

  • Complete audit trail for PII
  • Tamper-evident logging
  • Audit log backup
  • Audit log analysis
  • Compliance reporting from logs
  • Forensic investigation capability
  • Log export capability

BACKUP AND RECOVERY

Backup Controls

  • Regular automated backups
  • Backup encryption enabled
  • Offsite backup storage
  • Backup retention policy
  • Backup integrity verification
  • Backup access control
  • Backup deletion procedures
  • Backup audit logging

Disaster Recovery

  • Disaster recovery plan documented
  • RPO defined and achievable
  • RTO defined and achievable
  • DR testing (annual minimum)
  • Failover procedures documented
  • Alternative processing site
  • Data replication configured
  • Communication plan

VULNERABILITY MANAGEMENT

Scanning and Assessment

  • Automated vulnerability scanning
  • Regular penetration testing (annual)
  • Patch management process
  • Critical patch SLA (<30 days)
  • Vulnerability tracking system
  • Risk-based prioritization
  • Remediation verification
  • Third-party security assessments

Configuration Management

  • Security baselines defined
  • Configuration management database
  • Hardening standards applied
  • Unnecessary services disabled
  • Default passwords changed
  • Security configuration audits
  • Change control process
  • Configuration drift detection

INCIDENT RESPONSE

Incident Handling

  • Incident response plan documented
  • Incident response team defined
  • 24/7 incident response capability
  • Incident classification procedure
  • Escalation procedures
  • Communication templates
  • Forensic investigation capability
  • Post-incident review process

Breach Notification

  • Breach assessment procedures
  • Customer notification process (24 hours)
  • Regulatory notification procedures
  • Breach notification templates
  • Breach tracking system
  • Breach impact assessment
  • Remediation planning
  • Public disclosure procedures (if required)

IMPLEMENTATION SCORING

Calculate your completion:

Total Controls: 200+
Implemented: _____
Percentage: _____

Scoring:
95-100%: Excellent - Audit ready
85-94%: Good - Minor gaps
75-84%: Fair - Significant work needed
<75%: Poor - Major implementation required

By Category:

  • Encryption: ___ / 30
  • Access Control: ___ / 25
  • Data Deletion: ___ / 20
  • Sub-processors: ___ / 15
  • Network Security: ___ / 20
  • Application Security: ___ / 20
  • Logging & Monitoring: ___ / 20
  • Backup & Recovery: ___ / 15
  • Vulnerability Management: ___ / 15
  • Incident Response: ___ / 15

REMEDIATION PRIORITIES

Critical (Address Immediately):

  • Unencrypted PII
  • No access controls on PII
  • No audit logging
  • No incident response plan
  • Unpatched critical vulnerabilities

High (Address Within 30 Days):

  • Weak encryption
  • Inadequate access controls
  • Missing backup encryption
  • No deletion capability
  • Limited monitoring

Medium (Address Within 90 Days):

  • Incomplete logging
  • Manual processes
  • Documentation gaps
  • Testing backlog
  • Training needs

Congratulations!

You've completed Module 3: Technical Implementation. You now have the technical knowledge and tools to implement ISO 27018 cloud privacy controls.

Next Module: Compliance & Certification - Learn documentation requirements, audit preparation, and how to achieve ISO 27018 certification.

Complete this lesson

Earn +75 XP and progress to the next lesson